We are replacing the Seamaids’ single plank-on-batten bottom with a True 5200, which is double plank. We will use longitudinal strings to ensure an absolutely true and fair frame. Once sealed and painted, we will install her new bottom frame bedded in 5200 and secured with silicon bronze wood screws and carriage bolts. Once Joe finishes final fabrication of the stem, we will remove, seal and bilge paint all structural members. (We use FAS grade white oak for the structural members.) Our 1948 18-foot Century Seamaid is well on her way to having a virtually all-new bottom from the waterline down.Īll be three new frames, the stem and the gripe, as well as the chine frames and bottom bow have been fabricated and rough-installed. Merry Christmas, Happy Holidays and Happy New Year to one and all! The planks will be in place, sealed again with multiple coats of CPES and have received five coats of Interlux 2000E Two-Part Barrier Coat Primer by Christmas. The ply will be in place by today’s close.
0 Comments
Leave a Reply. |